UCC2540EVM-054

Mfr. #: UCC2540EVM-054
제조사: Texas Instruments
설명: Power Management IC Development Tools UCC2540-054 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: UCC2540EVM-054 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC2540EVM-054 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Primary/Secondary Side Controllers type. 24 V Input Voltage Output Voltage is 1.5 V, 3.3 V Dimensions of 152.4 mm x 127 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

UCC2540EVM-054 Image

UCC2540EVM-054

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC2540EVM-054 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Primary/Secondary Side Controllers
  • Tool Is For Evaluation Of: UCC2540
  • Input Voltage: 24 V
  • Output Voltage: 1.5 V, 3.3 V
  • Dimensions: 152.4 mm x 127 mm
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

UCC2540EVM-054

UCC2540EVM-054 Specifications

UCC2540EVM-054 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Primary/Secondary Side Controllers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 24 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.5 V, 3.3 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 152.4 mm x 127 mm

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top