UCC25630-1EVM-291

Mfr. #: UCC25630-1EVM-291
제조사: Texas Instruments
설명: Power Management IC Development Tools UCC256301 LLC Evaluation Module
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: UCC25630-1EVM-291 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC25630-1EVM-291 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 85 VAC to 264 VAC, 340 VDC to 410 VDC Input Voltage Output Voltage is 12 V Output current: 10 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.863623 oz of Unit Weight

UCC25630-1EVM-291 Image

UCC25630-1EVM-291

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC25630-1EVM-291 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: UCC25630
  • Input Voltage: 85 VAC to 264 VAC, 340 VDC to 410 VDC
  • Output Voltage: 12 V
  • Description/Function: Evaluates the UCC25630 LLC control device
  • Output Current: 10 A
  • Series: UCC256301
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1.863623 oz

UCC25630-1EVM-291

UCC25630-1EVM-291 Specifications

UCC25630-1EVM-291 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 85 VAC to 264 VAC, 340 VDC to 410 VDC.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 12 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 10 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 1.863623 oz.

11 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top