UCC27423-4-5-Q1EVM

Mfr. #: UCC27423-4-5-Q1EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools UCC27423-4-5-Q1EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: UCC27423-4-5-Q1EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC27423-4-5-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the IGBT Drivers, MOSFET Drivers type. 4 V to 15 V Input Voltage Output current: 4 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.084336 oz of Unit Weight

UCC27423-4-5-Q1EVM Image

UCC27423-4-5-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC27423-4-5-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: IGBT Drivers, MOSFET Drivers
  • Tool Is For Evaluation Of: UCC2742x-Q1
  • Input Voltage: 4 V to 15 V
  • Output Current: 4 A
  • Series: UCC2742xQ1
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.084336 oz

UCC27423-4-5-Q1EVM

UCC27423-4-5-Q1EVM Specifications

UCC27423-4-5-Q1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is IGBT Drivers, MOSFET Drivers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4 V to 15 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 4 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 125 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.084336 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top