UCD9081EVM

Mfr. #: UCD9081EVM
제조사: Texas Instruments
설명: Power Management IC Development Tools UCD9081EVM Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: UCD9081EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCD9081EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Supervisory Circuits type. 1.4 V to 2.4 V Input Voltage Output Voltage is 2.6 V Dimensions of 134.6 mm x 106.7 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.060455 oz of Unit Weight

UCD9081EVM Image

UCD9081EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCD9081EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Supervisory Circuits
  • Tool Is For Evaluation Of: UCD9081
  • Input Voltage: 1.4 V to 2.4 V
  • Output Voltage: 2.6 V
  • Dimensions: 134.6 mm x 106.7 mm
  • Series: UCD9081
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1.060455 oz

UCD9081EVM

UCD9081EVM Specifications

UCD9081EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Supervisory Circuits.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 1.4 V to 2.4 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 2.6 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 134.6 mm x 106.7 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 1.060455 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top