UCD9224EVM-464

Mfr. #: UCD9224EVM-464
제조사: Texas Instruments
설명: Power Management IC Development Tools Eval Mod for UCD9224
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: UCD9224EVM-464 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCD9224EVM-464 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 1.8 V, 2.5 V Output current: 12.5 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.094520 oz of Unit Weight

UCD9224EVM-464 Image

UCD9224EVM-464

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCD9224EVM-464 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: UCD9224, UCD7242
  • Input Voltage: 12 V
  • Output Voltage: 1.8 V, 2.5 V
  • Description/Function: The UCD9224EVM-464 includes the Digital Power Controller paired with the UCD7242 driver on the PTD08D210W module to create a power system consisting of two single-phase, point-of-load (POL) power rails, each capable of up to 10 A of output current
  • Output Current: 12.5 A
  • Series: UCD9224
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.094520 oz

UCD9224EVM-464

UCD9224EVM-464 Specifications

UCD9224EVM-464 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 12 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.8 V, 2.5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 12.5 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.094520 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top