XTR108EVM

Mfr. #: XTR108EVM
제조사: Texas Instruments
설명: Data Conversion IC Development Tools XTR108 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: XTR108EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
XTR108EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Voltage to Current Converters type. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

XTR108EVM Image

XTR108EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

XTR108EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Type: Voltage to Current Converters
  • Tool Is For Evaluation Of: XTR108
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

XTR108EVM

XTR108EVM Specifications

XTR108EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage to Current Converters.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
Top