ADC14X250EVM

Mfr. #: ADC14X250EVM
제조사: Texas Instruments
설명: EVAL BOARD FOR ADC14X250
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADC14X250EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC14X250EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product's 250M. Data-Interface: Serial JESD204B, SPI 14 bits 1 units Input range: 1.7 Vpp Included item: Board. IC package type: ADC14X250 This product operates at a 5 V supply voltage for reliable performance. This product is an ADC14X250 evaluation module. This tool is designed for the ADC14X250. USB interface type

ADC14X250EVM Image

ADC14X250EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC14X250EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Sampling-Rate-Per-Second 250M
  • Data-Interface Serial JESD204B, SPI
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 1.7 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC14X250
  • Power-Typ-Conditions 584mW @ 250MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function ADC14X250 evaluation module
  • Tool-Is-For-Evaluation-Of ADC14X250
  • Interface-Type USB

ADC14X250EVM

ADC14X250EVM Specifications

ADC14X250EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 250M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial JESD204B, SPI.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 1.7 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADC14X250

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed ADC14X250 evaluation module

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADC14X250

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$748.50
US$748.50
10
US$711.08
US$7 110.75
100
US$673.65
US$67 365.00
500
US$636.22
US$318 112.50
1000
US$598.80
US$598 800.00
Top