ADC32J22EVM

Mfr. #: ADC32J22EVM
제조사: Texas Instruments
설명: EVAL MODULE ADC32J22
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADC32J22EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC32J22EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product This product's 50M. Data-Interface: JESD204B Serial 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC32J22

ADC32J22EVM Image

ADC32J22EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC32J22EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Packaging Bulk
  • Sampling-Rate-Per-Second 50M
  • Data-Interface JESD204B Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC32J22
  • Power-Typ-Conditions 281mW @ 50MSPS

ADC32J22EVM

ADC32J22EVM Specifications

ADC32J22EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 50M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is JESD204B Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADC32J22.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$448.50
US$448.50
10
US$426.08
US$4 260.75
100
US$403.65
US$40 365.00
500
US$381.22
US$190 612.50
1000
US$358.80
US$358 800.00
Top