ADS1148EVM-PDK

Mfr. #: ADS1148EVM-PDK
제조사: Texas Instruments
설명: KIT PERFORMANCE DEMO FOR ADS1148
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS1148EVM-PDK 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1148EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 5 ~ 2k. Data-Interface: SPI 16 bits 1 units Input range: ±VREF/gain Included item: 2 Boards. IC package type: ADS1148 This product operates at a 5.5 V supply voltage for reliable performance. This tool is designed for the ADS1148. USB interface type

ADS1148EVM-PDK Image

ADS1148EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1148EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 5 ~ 2k
  • Data-Interface SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range ±VREF/gain
  • Supplied-Contents 2 Boards
  • Utilized-IC-Part ADS1148
  • Power-Typ-Conditions 2.3mW @ 20sps
  • Operating-Supply-Voltage 5.5 V
  • Tool-Is-For-Evaluation-Of ADS1148
  • Interface-Type USB

ADS1148EVM-PDK

ADS1148EVM-PDK Specifications

ADS1148EVM-PDK FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 5 ~ 2k

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is SPI.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is ±VREF/gain.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS1148

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5.5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS1148

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$309.04
US$309.04
10
US$293.59
US$2 935.93
100
US$278.14
US$27 814.05
500
US$262.69
US$131 344.15
1000
US$247.24
US$247 236.00
Top