ADS4246EVM

Mfr. #: ADS4246EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR ADS4246
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS4246EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4246EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 160M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4246 This tool is designed for the ADS4246. USB interface type

ADS4246EVM Image

ADS4246EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4246EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 160M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4246
  • Power-Typ-Conditions -
  • Tool-Is-For-Evaluation-Of ADS4246
  • Interface-Type USB

ADS4246EVM

ADS4246EVM Specifications

ADS4246EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 160M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is CMOS, LVDS, Serial, Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS4246.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS4246

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$448.50
US$448.50
10
US$426.08
US$4 260.75
100
US$403.65
US$40 365.00
500
US$381.22
US$190 612.50
1000
US$358.80
US$358 800.00
Top