ADS42B49EVM

Mfr. #: ADS42B49EVM
제조사: Texas Instruments
설명: MODULE EVAL FOR ADS42B49
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS42B49EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42B49EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS42B49 amplifier. This product's 250M. Data-Interface: LVDS - Parallel, Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS42B49 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS42B49EVM evaluation module. This tool is designed for the ADS42B49. 330 mA is 92 nA. Parallel Serial interface type

ADS42B49EVM Image

ADS42B49EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42B49EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS42B49
  • Sampling-Rate-Per-Second 250M
  • Data-Interface LVDS - Parallel, Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS42B49
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS42B49EVM evaluation module
  • Tool-Is-For-Evaluation-Of ADS42B49
  • Operating-Supply-Current 330 mA
  • Interface-Type Parallel Serial

ADS42B49EVM

ADS42B49EVM Specifications

ADS42B49EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS42B49.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 250M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is LVDS - Parallel, Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS42B49

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is ADS42B49EVM evaluation module.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS42B49

  • A: At what frequency does the Operating-Supply-Current?

    Q: The product Operating-Supply-Current is 330 mA.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed Parallel Serial

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$448.50
US$448.50
10
US$426.08
US$4 260.75
100
US$403.65
US$40 365.00
500
US$381.22
US$190 612.50
1000
US$358.80
US$358 800.00
Top