ADS5481EVM

Mfr. #: ADS5481EVM
제조사: Texas Instruments
설명: EVALUATON MODULE FOR ADS5481
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS5481EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5481EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 80M. Data-Interface: Parallel 16 bits 1 units Input range: 3 Vpp Included item: Board. IC package type: ADS5481 This product operates at a 6 V to 36 V supply voltage for reliable performance. This tool is designed for the ADS5481. SMA interface type

ADS5481EVM Image

ADS5481EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5481EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 80M
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 3 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5481
  • Power-Typ-Conditions 2.15W @ 80MSPS
  • Operating-Supply-Voltage 6 V to 36 V
  • Tool-Is-For-Evaluation-Of ADS5481
  • Interface-Type SMA

ADS5481EVM

ADS5481EVM Specifications

ADS5481EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 80M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 16.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 3 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5481.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 6 V to 36 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS5481

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$346.23
US$346.23
10
US$328.92
US$3 289.18
100
US$311.61
US$31 160.70
500
US$294.30
US$147 147.75
1000
US$276.98
US$276 984.00
Top