ADS54T02EVM

Mfr. #: ADS54T02EVM
제조사: Texas Instruments
설명: EVALUATION MODULE FOR ADS5402
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS54T02EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54T02EVM Overview

Product belongs to the - series. This product's 750M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS54T02

ADS54T02EVM Image

ADS54T02EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54T02EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 750M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS54T02
  • Power-Typ-Conditions 2.1W @ 750MSPS

ADS54T02EVM

ADS54T02EVM Specifications

ADS54T02EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 750M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is DDR LVDS.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS54T02

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$577.80
US$577.80
10
US$548.91
US$5 489.10
100
US$520.02
US$52 002.00
500
US$491.13
US$245 565.00
1000
US$462.24
US$462 240.00
Top