ADS6224EVM

Mfr. #: ADS6224EVM
제조사: Texas Instruments
설명: ADS6224EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS6224EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6224EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 105M. Data-Interface: Serial, Parallel 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6224 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6224. SMA interface type

ADS6224EVM Image

ADS6224EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6224EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 105M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6224
  • Power-Typ-Conditions 405mW @ 105MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS6224
  • Interface-Type SMA

ADS6224EVM

ADS6224EVM Specifications

ADS6224EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 105M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial, Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS6224

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS6224.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$336.02
US$336.02
10
US$319.21
US$3 192.14
100
US$302.41
US$30 241.35
500
US$285.61
US$142 806.40
1000
US$268.81
US$268 812.00
Top