ADS7888EVM

Mfr. #: ADS7888EVM
제조사: Texas Instruments
설명: EVALUATION MODULE FOR ADS7888
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS7888EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7888EVM Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 1.25M. Data-Interface: Serial 8 bits 1 units Input range: 0 ~ 5.25 V Included item: Board. IC package type: ADS7888 This product operates at a 2.35 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS7888.

ADS7888EVM Image

ADS7888EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7888EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 1.25M
  • Data-Interface Serial
  • Number-of-Bits 8
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5.25 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7888
  • Power-Typ-Conditions 3.8mW @ 3 V, 8mW @ 5 V
  • Operating-Supply-Voltage 2.35 V to 5.25 V
  • Tool-Is-For-Evaluation-Of ADS7888

ADS7888EVM

ADS7888EVM Specifications

ADS7888EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is microPOWER.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 1.25M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 8

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5.25 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7888.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.35 V to 5.25 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS7888.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top