ADS8331EVM

Mfr. #: ADS8331EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR ADS8331
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS8331EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8331EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 500k. Data-Interface: DSP, Serial, SPI 16 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS8331 This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the ADS8331. Unipolar interface type

ADS8331EVM Image

ADS8331EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8331EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 500k
  • Data-Interface DSP, Serial, SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8331
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of ADS8331
  • Interface-Type Unipolar

ADS8331EVM

ADS8331EVM Specifications

ADS8331EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 500k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed DSP, Serial, SPI

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 0 ~ VREF

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS8331.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.7 V to 5.5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8331.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Unipolar.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$94.56
US$94.56
10
US$89.83
US$898.32
100
US$85.10
US$8 510.40
500
US$80.38
US$40 188.00
1000
US$75.65
US$75 648.00
Top