ADS8860EVM-PDK

Mfr. #: ADS8860EVM-PDK
제조사: Texas Instruments
설명: BOARD EVAL ADC 16BIT 1MSPS
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: ADS8860EVM-PDK 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8860EVM-PDK Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS8860 amplifier. This product's 1M. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ VREF Included item: 2 Boards, Cable, Power Supply. IC package type: ADS8860 This product operates at a 5 V supply voltage for reliable performance. This product is an Pseudo-diffrential unipolar SAR. This tool is designed for the ADS8860. SPI USB interface type

ADS8860EVM-PDK Image

ADS8860EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8860EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS8860
  • Sampling-Rate-Per-Second 1M
  • Data-Interface SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ VREF
  • Supplied-Contents 2 Boards, Cable, Power Supply
  • Utilized-IC-Part ADS8860
  • Power-Typ-Conditions 5.5mW @ 1MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function Pseudo-diffrential unipolar SAR
  • Tool-Is-For-Evaluation-Of ADS8860
  • Interface-Type SPI USB

ADS8860EVM-PDK

ADS8860EVM-PDK Specifications

ADS8860EVM-PDK FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS8860.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 1M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed SPI

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 16.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ VREF.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards, Cable, Power Supply.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8860.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Pseudo-diffrential unipolar SAR

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8860

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$299.84
US$299.84
10
US$284.84
US$2 848.43
100
US$269.85
US$26 985.15
500
US$254.86
US$127 429.90
1000
US$239.87
US$239 868.00
Top