AFE4490SPO2EVM

Mfr. #: AFE4490SPO2EVM
제조사: Texas Instruments
설명: EVALUATION MODULE AFE4490
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: AFE4490SPO2EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE4490SPO2EVM Overview

Product belongs to the - series. This product is categorized as Development Boards Type: Ultrasound AFE This product is designed AFE4400 AFE4490 amplifier. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: Medical Pulse Oximeter Applications IC package type: AFE4490 This product operates at a 2 V to 3.6 V supply voltage for reliable performance. This tool is designed for the AFE4400 AFE4490. USB interface type

AFE4490SPO2EVM Image

AFE4490SPO2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE4490SPO2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Development Boards
  • Type Ultrasound AFE
  • For-Use-With AFE4400 AFE4490
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes Medical Pulse Oximeter Applications
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part AFE4490
  • Operating-Supply-Voltage 2 V to 3.6 V
  • Tool-Is-For-Evaluation-Of AFE4400 AFE4490
  • Interface-Type USB

AFE4490SPO2EVM

AFE4490SPO2EVM Specifications

AFE4490SPO2EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Development Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Ultrasound AFE.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed AFE4400 AFE4490

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Medical Pulse Oximeter Applications.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AFE4490.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2 V to 3.6 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is AFE4400 AFE4490.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$223.50
US$223.50
10
US$212.32
US$2 123.25
100
US$201.15
US$20 115.00
500
US$189.98
US$94 987.50
1000
US$178.80
US$178 800.00
Top