AFE5805EVM

Mfr. #: AFE5805EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR AFE5805
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: AFE5805EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5805EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Ultrasound AFE This product is designed TSW1250EVM ADSDeSer-50EVM amplifier. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5805 This product operates at a 5 V supply voltage for reliable performance. This product is an AFE5805EVM is an evaluation tool designed for the ultrasound analog front-end. This tool is designed for the AFE5805. RS-232 USB interface type

AFE5805EVM Image

AFE5805EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5805EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Ultrasound AFE
  • For-Use-With TSW1250EVM ADSDeSer-50EVM
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5805
  • Operating-Supply-Voltage 5 V
  • Description-Function AFE5805EVM is an evaluation tool designed for the ultrasound analog front-end
  • Tool-Is-For-Evaluation-Of AFE5805
  • Interface-Type RS-232 USB

AFE5805EVM

AFE5805EVM Specifications

AFE5805EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Ultrasound AFE.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TSW1250EVM ADSDeSer-50EVM

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 8 Channel LVDS Outputs

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AFE5805.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is AFE5805EVM is an evaluation tool designed for the ultrasound analog front-end.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is AFE5805.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is RS-232 USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$298.50
US$298.50
10
US$283.58
US$2 835.75
100
US$268.65
US$26 865.00
500
US$253.72
US$126 862.50
1000
US$238.80
US$238 800.00
Top