AMC1305M25EVM

Mfr. #: AMC1305M25EVM
제조사: Texas Instruments
설명: EVAL MOD SIGMA DELTA 1CH
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: AMC1305M25EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1305M25EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product is designed AMC1305 amplifier. This product's 78k. Data-Interface: Serial 16 bits 1 units Input range: ±250 mV Included item: Board. IC package type: AMC1305M25 This product is an Isolated Single-Channel Delta-Sigma Modulator. This tool is designed for the AMC1305M25.

AMC1305M25EVM Image

AMC1305M25EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1305M25EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With AMC1305
  • Sampling-Rate-Per-Second 78k
  • Data-Interface Serial
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range ±250 mV
  • Supplied-Contents Board
  • Utilized-IC-Part AMC1305M25
  • Power-Typ-Conditions 18mW @ 78kSPS
  • Description-Function Isolated Single-Channel Delta-Sigma Modulator
  • Tool-Is-For-Evaluation-Of AMC1305M25

AMC1305M25EVM

AMC1305M25EVM Specifications

AMC1305M25EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is AMC1305.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 78k

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 16.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is ±250 mV.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed AMC1305M25

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Isolated Single-Channel Delta-Sigma Modulator.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed AMC1305M25

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top