BQ27531EVM

Mfr. #: BQ27531EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR BQ27531
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: BQ27531EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ27531EVM Overview

Product belongs to the Impedance Track series. This product is categorized as Evaluation Modules Type: Battery Management This product is designed bq24192 amplifier. The Power Management, Fuel Gauge is the Main-Purpose. Primary-Attributes: - IC package type: BQ27531 This product is an Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell. This tool is designed for the BQ24192. I2C USB interface type Input Voltage Range: 4.2 V to 10 V

BQ27531EVM Image

BQ27531EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27531EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series Impedance Track
  • Product Evaluation Modules
  • Type Battery Management
  • For-Use-With bq24192
  • Main-Purpose Power Management, Fuel Gauge
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part BQ27531
  • Description-Function Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell
  • Tool-Is-For-Evaluation-Of BQ24192
  • Interface-Type I2C USB
  • Input-Voltage 4.2 V to 10 V

BQ27531EVM

BQ27531EVM Specifications

BQ27531EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is Impedance Track.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is bq24192.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Fuel Gauge.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is BQ27531.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Has a bq27531-G1 gas gauge that directly communicates with bq24192 single-cell

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is BQ24192.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 4.2 V to 10 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top