BQ34Z100EVM

Mfr. #: BQ34Z100EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR BQ34Z100
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: BQ34Z100EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ34Z100EVM Overview

Product belongs to the Impedance Track series. This product is categorized as Evaluation Modules Type: Battery Management The Power Management, Fuel Gauge is the Main-Purpose. Primary-Attributes: - IC package type: BQ34Z100 This tool is designed for the BQ34Z100. Input Voltage Range: 2.7 V to 4.5 V

BQ34Z100EVM Image

BQ34Z100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ34Z100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series Impedance Track
  • Product Evaluation Modules
  • Type Battery Management
  • Main-Purpose Power Management, Fuel Gauge
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part BQ34Z100
  • Tool-Is-For-Evaluation-Of BQ34Z100
  • Input-Voltage 2.7 V to 4.5 V

BQ34Z100EVM

BQ34Z100EVM Specifications

BQ34Z100EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is Impedance Track.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Fuel Gauge

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is BQ34Z100.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is BQ34Z100.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 2.7 V to 4.5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top