DAC5681EVM

Mfr. #: DAC5681EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR DAC5681
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DAC5681EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5681EVM Overview

This product is categorized as Evaluation Boards Type: DAC This tool is designed for the DAC5681.

DAC5681EVM Image

DAC5681EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5681EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Tool-Is-For-Evaluation-Of DAC5681

DAC5681EVM

DAC5681EVM Specifications

DAC5681EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC5681.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$577.80
US$577.80
10
US$548.91
US$5 489.10
100
US$520.02
US$52 002.00
500
US$491.13
US$245 565.00
1000
US$462.24
US$462 240.00
Top