DAC5687EVM

Mfr. #: DAC5687EVM
제조사: Texas Instruments
설명: EVALUATION MODULE FOR DAC5687
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DAC5687EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5687EVM Overview

This product is categorized as Evaluation Boards Type: DAC This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the DAC5687. SMA interface type

DAC5687EVM Image

DAC5687EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5687EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of DAC5687
  • Interface-Type SMA

DAC5687EVM

DAC5687EVM Specifications

DAC5687EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC5687

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$191.91
US$191.91
10
US$182.31
US$1 823.14
100
US$172.72
US$17 271.87
500
US$163.12
US$81 561.60
1000
US$153.53
US$153 527.80
Top