DAC8581EVM

Mfr. #: DAC8581EVM
제조사: Texas Instruments
설명: EVALUATION MODULE FOR DAC8581EVM
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DAC8581EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8581EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8581.

DAC8581EVM Image

DAC8581EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8581EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8581

DAC8581EVM

DAC8581EVM Specifications

DAC8581EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8581.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$91.77
US$91.77
10
US$87.18
US$871.82
100
US$82.59
US$8 259.30
500
US$78.00
US$39 002.25
1000
US$73.42
US$73 416.00
Top