DAC8760EVM

Mfr. #: DAC8760EVM
제조사: Texas Instruments
설명: EVAL BOARD 16BIT DAC
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DAC8760EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8760EVM Overview

Product belongs to the DAC8760 series. This product is categorized as Evaluation Kits Type: DAC Bulk is the packaging method for this product This product is designed DAC8760 amplifier. This product is an Complete evaluation kit that includes a USB-based motherboard and software. This tool is designed for the DAC8760. USB interface type

DAC8760EVM Image

DAC8760EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8760EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC8760
  • Product Evaluation Kits
  • Type DAC
  • Packaging Bulk
  • For-Use-With DAC8760
  • Description-Function Complete evaluation kit that includes a USB-based motherboard and software
  • Tool-Is-For-Evaluation-Of DAC8760
  • Interface-Type USB

DAC8760EVM

DAC8760EVM Specifications

DAC8760EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is DAC8760.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is DAC8760.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Complete evaluation kit that includes a USB-based motherboard and software.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8760.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$212.23
US$212.23
10
US$201.62
US$2 016.20
100
US$191.01
US$19 100.84
500
US$180.40
US$90 198.40
1000
US$169.79
US$169 785.20
Top