DAC8801EVM

Mfr. #: DAC8801EVM
제조사: Texas Instruments
설명: EVALUATION MODULE FOR DAC8801
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DAC8801EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8801EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the DAC8801.

DAC8801EVM Image

DAC8801EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8801EVM Specifications
  • Manufacturer TI
  • Product Category Evaluation Boards - Digital to Analog Converters (DACs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of DAC8801

DAC8801EVM

DAC8801EVM Specifications

DAC8801EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V to 15 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC8801

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$55.06
US$55.06
10
US$52.31
US$523.12
100
US$49.56
US$4 955.85
500
US$46.81
US$23 402.65
1000
US$44.05
US$44 052.00
Top