DLPDLCR2010EVM-PCB

Mfr. #: DLPDLCR2010EVM-PCB
제조사: Texas Instruments
설명: EVALUATION MODULE
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DLPDLCR2010EVM-PCB 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR2010EVM-PCB Overview

RoHS compliant with Details This product is categorized as Evaluation Modules The DLP2010 ADSP-2189M, enabling fast and efficient testing. The 5 V is 15 V. Interface Type: Audio HDMI

DLPDLCR2010EVM-PCB Image

DLPDLCR2010EVM-PCB

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR2010EVM-PCB Specifications
  • Manufacturer Texas Instruments
  • Product Category Accessories
  • RoHS Details
  • Brand Texas Instruments
  • Product Evaluation Modules
  • Tool Is For Evaluation Of DLP2010
  • Operating Supply Voltage 5 V
  • Interface Type Audio HDMI

DLPDLCR2010EVM-PCB

DLPDLCR2010EVM-PCB Specifications

DLPDLCR2010EVM-PCB FAQ
  • A: What is the RoHS of the product?

    Q: The RoHS of the product is Details.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Tool Is For Evaluation Of of the product?

    Q: The Tool Is For Evaluation Of of the product is DLP2010.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Audio HDMI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$373.50
US$373.50
10
US$354.82
US$3 548.25
100
US$336.15
US$33 615.00
500
US$317.48
US$158 737.50
1000
US$298.80
US$298 800.00
Top