DRV10866EVM

Mfr. #: DRV10866EVM
제조사: Texas Instruments
설명: MODULE EVAL FOR DRV10866
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DRV10866EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV10866EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV10866 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 3-Ph Brushless DC (BLDC) Motors IC package type: DRV10866 This tool is designed for the DRV10866. Input Voltage Range: 2 V to 5.5 V

DRV10866EVM Image

DRV10866EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV10866EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV10866
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 3-Ph Brushless DC (BLDC) Motors
  • Embedded No
  • Utilized-IC-Part DRV10866
  • Tool-Is-For-Evaluation-Of DRV10866
  • Input-Voltage 2 V to 5.5 V

DRV10866EVM

DRV10866EVM Specifications

DRV10866EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed DRV10866

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 3-Ph Brushless DC (BLDC) Motors.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV10866

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV10866.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$37.50
US$37.50
10
US$35.62
US$356.25
100
US$33.75
US$3 375.00
500
US$31.88
US$15 937.50
1000
US$30.00
US$30 000.00
Top