DRV421EVM

Mfr. #: DRV421EVM
제조사: Texas Instruments
설명: EVAL MODULE DRV421
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DRV421EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV421EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Magnetic Sensors Bulk is the packaging method for this product Sensitivity: - Interface: - Voltage Supply Range: 3 V ~ 5.5 V Current Sensor Sensing range of - Included item: Board. IC package type: DRV421 This product operates at a 3 V to 5.5 V supply voltage for reliable performance. This product is an DRV421 losed-loop current sense conditioner with integrated fluxgate sensor. This tool is designed for the DRV421.

DRV421EVM Image

DRV421EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV421EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Magnetic Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface -
  • Voltage-Supply 3 V ~ 5.5 V
  • Sensor-Type Current Sensor
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part DRV421
  • Operating-Supply-Voltage 3 V to 5.5 V
  • Description-Function DRV421 losed-loop current sense conditioner with integrated fluxgate sensor
  • Tool-Is-For-Evaluation-Of DRV421

DRV421EVM

DRV421EVM Specifications

DRV421EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Magnetic Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: What is the Interface of the product?

    Q: The Interface of the product is -.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 3 V ~ 5.5 V.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Current Sensor

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV421.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3 V to 5.5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is DRV421 losed-loop current sense conditioner with integrated fluxgate sensor.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV421

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top