DRV602EVM2

Mfr. #: DRV602EVM2
제조사: Texas Instruments
설명: EVAL MODULE FOR DRV602
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DRV602EVM2 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV602EVM2 Overview

Product belongs to the DirectPath series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 5.5 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV602 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV602.

DRV602EVM2 Image

DRV602EVM2

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV602EVM2 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series DirectPath
  • Type Audio Amplifiers
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 3 V ~ 5.5 V
  • Max-Output-Power-x-Channels-Load -
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Utilized-IC-Part DRV602
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DRV602

DRV602EVM2

DRV602EVM2 Specifications

DRV602EVM2 FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is DirectPath.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifiers.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 2-Channel (Stereo).

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 3 V ~ 5.5 V.

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is -.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class AB.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV602.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV602.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top