DRV612EVM Overview

Product belongs to the DirectPath series. Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 3.6 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV612 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV612.

DRV612EVM Image

DRV612EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV612EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series DirectPath
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 3 V ~ 3.6 V
  • Max-Output-Power-x-Channels-Load -
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Utilized-IC-Part DRV612
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DRV612

DRV612EVM

DRV612EVM Specifications

DRV612EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DirectPath.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 2-Channel (Stereo).

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 3 V ~ 3.6 V.

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is -.

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Class AB

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV612.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV612

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00