DRV8432EVM

Mfr. #: DRV8432EVM
제조사: Texas Instruments
설명: EVAL MODUOLE FOR DRV8432
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DRV8432EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8432EVM Overview

Product belongs to the DRV8432 series. This product is categorized as Evaluation Boards Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8432 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV8432 Output voltage: 0 V to 52.5 V This product is an Dual full-bridge PWM motor driver. This tool is designed for the DRV8432. Input Voltage Range: 12 V Output current: 14 A

DRV8432EVM Image

DRV8432EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8432EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8432
  • Product Evaluation Boards
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8432
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part DRV8432
  • Output-Voltage 0 V to 52.5 V
  • Description-Function Dual full-bridge PWM motor driver
  • Tool-Is-For-Evaluation-Of DRV8432
  • Input-Voltage 12 V
  • Output-Current 14 A

DRV8432EVM

DRV8432EVM Specifications

DRV8432EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DRV8432.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is DRV8432.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8432.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 0 V to 52.5 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Dual full-bridge PWM motor driver.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8432

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 12 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 14 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$223.50
US$223.50
10
US$212.32
US$2 123.25
100
US$201.15
US$20 115.00
500
US$189.98
US$94 987.50
1000
US$178.80
US$178 800.00
Top