DRV8803EVM

Mfr. #: DRV8803EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR DRV8803
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: DRV8803EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8803EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: 1.5A @ 1 Channel, 800mA @ 4 Channels IC package type: DRV8803 Maximum operating temperature of + 85 C This tool is designed for the DRV8803. USB interface type

DRV8803EVM Image

DRV8803EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8803EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes 1.5A @ 1 Channel, 800mA @ 4 Channels
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8803
  • Maximum-Operating-Temperature + 85 C
  • Tool-Is-For-Evaluation-Of DRV8803
  • Interface-Type USB

DRV8803EVM

DRV8803EVM Specifications

DRV8803EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control, Stepper.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 1.5A @ 1 Channel, 800mA @ 4 Channels

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8803.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8803

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top