LM57EVM

Mfr. #: LM57EVM
제조사: Texas Instruments
설명: Sensor Development Tools Temperature Sensor Development Tools LM57 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: LM57EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM57EVM Overview

Product belongs to the LM57 series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±1.5°C Interface: Analog Voltage Supply Range: 2.4 V ~ 5.5 V Temperature Sensing range of -50°C ~ 150°C Included item: Board. IC package type: LM57 This tool is designed for the LM57.

LM57EVM Image

LM57EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM57EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LM57
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±1.5°C
  • Interface Analog
  • Voltage-Supply 2.4 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -50°C ~ 150°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part LM57
  • Tool-Is-For-Evaluation-Of LM57

LM57EVM

LM57EVM Specifications

LM57EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is LM57.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Temperature Sensors

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±1.5°C.

  • A: What is the Interface of the product?

    Q: The Interface of the product is Analog.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 2.4 V ~ 5.5 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -50°C ~ 150°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LM57.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LM57.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$43.50
US$43.50
10
US$41.32
US$413.25
100
US$39.15
US$3 915.00
500
US$36.98
US$18 487.50
1000
US$34.80
US$34 800.00
Top