| Mfr. #: | MUXIT-EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | EVAL MOD SN65LVDS150/151/152 |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | MUXIT-EVM 데이터 시트 |


Product belongs to the MuxIt series. The Interface, LVDS, PLL Multiplier / Serializer / Deserializer is the Main-Purpose. Primary-Attributes: - IC package type: SN65LVDS150, SN65LVDS151, SN65LVDS152

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MUXIT-EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is MuxIt.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Interface, LVDS, PLL Multiplier / Serializer / Deserializer.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is -.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is SN65LVDS150, SN65LVDS151, SN65LVDS152.