| Mfr. #: | PGA900EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | EVAL MODULE PGA900 |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | PGA900EVM 데이터 시트 |


Product belongs to the - series. This product is categorized as Evaluation Board Type: Signal Conditioning Bulk is the packaging method for this product The Interface, Sensor Signal Conditioner is the Main-Purpose. Primary-Attributes: - IC package type: PGA900 Maximum operating temperature of + 150 C Minimum operating temperature: - 40 C This product operates at a 3.3 V to 30 V supply voltage for reliable performance. This product is an Evaluation Baord for Resistive Sensing Conditioner. This tool is designed for the PGA900. I2C interface type Our product measures 5 in x 2.3 in in dimensions for compact and convenient use.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PGA900EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Board.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Signal Conditioning
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Interface, Sensor Signal Conditioner.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed -
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is PGA900.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 150 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 30 V
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed Evaluation Baord for Resistive Sensing Conditioner
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is PGA900.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is I2C.
A: Is the cutoff frequency of the product Dimensions?
Q: Yes, the product's Dimensions is indeed 5 in x 2.3 in