RF430F5978EVM

Mfr. #: RF430F5978EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR RF430F5987
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: RF430F5978EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
RF430F5978EVM Overview

Compatible with RF430F5978. Product belongs to the RF430F5978 series. This product is categorized as Evaluation Kits Type: Transceiver Bulk is the packaging method for this product This product is designed TPS62163 TPS62082 amplifier. This product's 300MHz ~ 950MHz range is 0Hz to 2.2GHz. Included item: 3 Boards. This product operates at a 2.1 V to 3 V supply voltage for reliable performance. This product is an Sub 1 GHz transceiver LF wake receiver/transponder SoC. This tool is designed for the RF430F5978. USB interface type

RF430F5978EVM Image

RF430F5978EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

RF430F5978EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products RF430F5978
  • Series RF430F5978
  • Product Evaluation Kits
  • Type Transceiver
  • Packaging Bulk
  • For-Use-With TPS62163 TPS62082
  • Frequency 300MHz ~ 950MHz
  • Supplied-Contents 3 Boards
  • Operating-Supply-Voltage 2.1 V to 3 V
  • Description-Function Sub 1 GHz transceiver LF wake receiver/transponder SoC
  • Tool-Is-For-Evaluation-Of RF430F5978
  • Interface-Type USB

RF430F5978EVM

RF430F5978EVM Specifications

RF430F5978EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is RF430F5978.

  • A: At what frequency does the Series?

    Q: The product Series is RF430F5978.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: At what frequency does the Type?

    Q: The product Type is Transceiver.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TPS62163 TPS62082.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 300MHz ~ 950MHz

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 3 Boards

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.1 V to 3 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Sub 1 GHz transceiver LF wake receiver/transponder SoC.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed RF430F5978

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$435.00
US$435.00
10
US$413.25
US$4 132.50
100
US$391.50
US$39 150.00
500
US$369.75
US$184 875.00
1000
US$348.00
US$348 000.00
Top