| Mfr. #: | THS4151EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | EVAL MOD FOR THS4151 |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | THS4151EVM 데이터 시트 |


Product belongs to the - series. Operational temperature range: 0°C ~ 70°C Output-Type: Differential Voltage supply range: 4 V ~ 33 V, ±2 V ~ 16.5 V The 150MHz The 650 V/μs. Current-Output-Channel is 85mA The amplifier is of Differential type. Included item: Board. IC package type: THS4151 Board type: Fully Populated. The product has 1 - Single channel per IC.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4151EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Operating-Temperature?
Q: The product Operating-Temperature is 0°C ~ 70°C.
A: At what frequency does the Output-Type?
Q: The product Output-Type is Differential.
A: What is the Voltage-Supply-Single-Dual of the product?
Q: The Voltage-Supply-Single-Dual of the product is 4 V ~ 33 V, ±2 V ~ 16.5 V.
A: What is the -3db-Bandwidth of the product?
Q: The -3db-Bandwidth of the product is 150MHz.
A: At what frequency does the Slew-Rate?
Q: The product Slew-Rate is 650 V/μs.
A: At what frequency does the Current-Output-Channel?
Q: The product Current-Output-Channel is 85mA.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Differential.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is THS4151.
A: At what frequency does the Board-Type?
Q: The product Board-Type is Fully Populated.
A: At what frequency does the Channels-per-IC?
Q: The product Channels-per-IC is 1 - Single.