THS4502EVM

Mfr. #: THS4502EVM
제조사: Texas Instruments
설명: EVAL MOD FOR THS4502
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: THS4502EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4502EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product Operational temperature range: 0°C ~ 70°C Output-Type: Differential Voltage supply range: 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V The 370MHz The 2800 V/μs. Current-Output-Channel is 120mA The amplifier is of Differential type. Included item: Board. IC package type: THS4502 Board type: Fully Populated. The product has 1 - Single channel per IC. This tool is designed for the THS4502.

THS4502EVM Image

THS4502EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4502EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • Operating-Temperature 0°C ~ 70°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V
  • -3db-Bandwidth 370MHz
  • Slew-Rate 2800 V/μs
  • Current-Output-Channel 120mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part THS4502
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 23mA
  • Tool-Is-For-Evaluation-Of THS4502

THS4502EVM

THS4502EVM Specifications

THS4502EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Operating-Temperature?

    Q: The product Operating-Temperature is 0°C ~ 70°C.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Differential

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V.

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 370MHz.

  • A: Is the cutoff frequency of the product Slew-Rate?

    Q: Yes, the product's Slew-Rate is indeed 2800 V/μs

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 120mA.

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Differential

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS4502

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 1 - Single.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is THS4502.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top