TLV70533EVM-596

Mfr. #: TLV70533EVM-596
제조사: Texas Instruments
설명: EVAL MODULE FOR TLV70533-596
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TLV70533EVM-596 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV70533EVM-596 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: LDO Voltage Regulators Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C 2 V ~ 5.5 V voltage input Output voltage: 3.3V Included item: Board. IC package type: TLV70533 Board type: Fully Populated. The product has 1 - Single channel per IC. This product features a Positive Fixed. Output voltage: 3.3 V This tool is designed for the TLV70533.

TLV70533EVM-596 Image

TLV70533EVM-596

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV70533EVM-596 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Linear Voltage Regulators
  • Series -
  • Product Evaluation Modules
  • Type LDO Voltage Regulators
  • Packaging Bulk
  • Operating-Temperature -40°C ~ 125°C
  • Voltage-Input 2 V ~ 5.5 V
  • Current-Output 200mA
  • Voltage-Output 3.3V
  • Supplied-Contents Board
  • Utilized-IC-Part TLV70533
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Regulator-Type Positive Fixed
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TLV70533

TLV70533EVM-596

TLV70533EVM-596 Specifications

TLV70533EVM-596 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 125°C.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 2 V ~ 5.5 V.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 3.3V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TLV70533.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 1 - Single

  • A: What is the Regulator-Type of the product?

    Q: The Regulator-Type of the product is Positive Fixed.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TLV70533.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$23.14
US$23.14
10
US$21.99
US$219.88
100
US$20.83
US$2 083.05
500
US$19.67
US$9 836.65
1000
US$18.52
US$18 516.00
Top