TMP007EVM

Mfr. #: TMP007EVM
제조사: Texas Instruments
설명: Sensor Development Tools Temperature Sensor Development Tools Evaluation Module
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TMP007EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP007EVM Overview

Product belongs to the TMP007 series. This product is categorized as Evaluation Modules Type: IR Thermopile Sensors Bulk is the packaging method for this product Sensitivity: - Interface: I2C, SMBus Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards. IC package type: TMP007 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TMP007. I2C SPI interface type

TMP007EVM Image

TMP007EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP007EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP007
  • Product Evaluation Modules
  • Type IR Thermopile Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface I2C, SMBus
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -
  • Supplied-Contents 2 Boards
  • Embedded No
  • Utilized-IC-Part TMP007
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TMP007
  • Interface-Type I2C SPI

TMP007EVM

TMP007EVM Specifications

TMP007EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed TMP007

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is IR Thermopile Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed -

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C, SMBus.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed -

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TMP007.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP007.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$65.34
US$65.34
10
US$62.07
US$620.73
100
US$58.81
US$5 880.60
500
US$55.54
US$27 769.50
1000
US$52.27
US$52 272.00
Top