TMP104EVM

Mfr. #: TMP104EVM
제조사: Texas Instruments
설명: Sensor Development Tools Temperature Sensor Development Tools TMP104 Eval Mod
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TMP104EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP104EVM Overview

Product belongs to the SMAARTWIRE series. Sensitivity: ±3°C Interface: - Voltage Supply Range: - Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP104

TMP104EVM Image

TMP104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series SMAARTWIRE
  • Sensitivity ±3°C
  • Interface -
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part TMP104

TMP104EVM

TMP104EVM Specifications

TMP104EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed SMAARTWIRE

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±3°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is -.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -40°C ~ 125°C.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards, Cables.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP104.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$112.50
US$112.50
10
US$106.88
US$1 068.75
100
US$101.25
US$10 125.00
500
US$95.62
US$47 812.50
1000
US$90.00
US$90 000.00
Top