TMP108EVM

Mfr. #: TMP108EVM
제조사: Texas Instruments
설명: Sensor Development Tools Temperature Sensor Development Tools TMP108 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TMP108EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP108EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Sensitivity: ±1°C Interface: I2C, SMBus, USB Voltage Supply Range: 1.4 V ~ 3.6 V Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP108 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP108. I2C USB interface type

TMP108EVM Image

TMP108EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP108EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Sensitivity ±1°C
  • Interface I2C, SMBus, USB
  • Voltage-Supply 1.4 V ~ 3.6 V
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded -
  • Utilized-IC-Part TMP108
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TMP108
  • Interface-Type I2C USB

TMP108EVM

TMP108EVM Specifications

TMP108EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±1°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C, SMBus, USB.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 1.4 V ~ 3.6 V

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -40°C ~ 125°C.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards, Cables.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP108.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 125 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V 3.3 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TMP108.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$112.50
US$112.50
10
US$106.88
US$1 068.75
100
US$101.25
US$10 125.00
500
US$95.62
US$47 812.50
1000
US$90.00
US$90 000.00
Top