TMP451EVM

Mfr. #: TMP451EVM
제조사: Texas Instruments
설명: Sensor Development Tools Temperature Sensor Development Tools TMP451 EVAL MOD
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TMP451EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP451EVM Overview

Product belongs to the TMP451 series. This product is categorized as Evaluation Modules Type: Temperature Sensors Sensitivity: ±1°C Interface: I2C Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards, Cables. IC package type: TMP451 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP451. I2C SPI interface type

TMP451EVM Image

TMP451EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP451EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP451
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Sensitivity ±1°C
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cables
  • Embedded -
  • Utilized-IC-Part TMP451
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TMP451
  • Interface-Type I2C SPI

TMP451EVM

TMP451EVM Specifications

TMP451EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is TMP451.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±1°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards, Cables.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TMP451.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP451

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$86.85
US$86.85
10
US$82.51
US$825.08
100
US$78.16
US$7 816.50
500
US$73.82
US$36 911.25
1000
US$69.48
US$69 480.00
Top