| Mfr. #: | TMP513EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Sensor Development Tools Temperature Sensor Development Tools TMP513 Eval Mod |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | TMP513EVM 데이터 시트 |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Sensitivity: - Interface: USB Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards, Cable. IC package type: TMP513 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 26 V supply voltage for reliable performance. This tool is designed for the TMP513.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP513EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Temperature Sensors
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is -.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed USB
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed -
A: Is the cutoff frequency of the product Sensor-Type?
Q: Yes, the product's Sensor-Type is indeed Temperature
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is -.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is 2 Boards, Cable.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TMP513.
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C
A: Is the cutoff frequency of the product Minimum-Operating-Temperature?
Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 26 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TMP513.