| Mfr. #: | TMP709EVM |
|---|---|
| 제조사: | Texas Instruments |
| 설명: | Sensor Development Tools Temperature Sensor Development Tools TMP709 Eval Mod |
| 수명 주기: | 이 제조업체의 새 제품입니다. |
| 데이터 시트: | TMP709EVM 데이터 시트 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP709 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP709.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP709EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is Temperature Sensors.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is ±3°C.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed Analog
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.
A: Is the cutoff frequency of the product Sensor-Type?
Q: Yes, the product's Sensor-Type is indeed Thermostat
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is 0°C ~ 125°C.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TMP709
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 5.5 V
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TMP709.