TPS2392EVM

Mfr. #: TPS2392EVM
제조사: Texas Instruments
설명: EVAL MODULE FOR TPS2392
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS2392EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2392EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2392 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2392. Our product measures 119.6 mm x 91.4 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

TPS2392EVM Image

TPS2392EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2392EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Hot Swap Voltage Controllers
  • Main-Purpose Power Management, Hot Swap Controller
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS2392
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Tool-Is-For-Evaluation-Of TPS2392
  • Dimensions 119.6 mm x 91.4 mm
  • Input-Voltage - 48 V

TPS2392EVM

TPS2392EVM Specifications

TPS2392EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Hot Swap Voltage Controllers.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Hot Swap Controller.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS2392

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS2392.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 119.6 mm x 91.4 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is - 48 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top