TPS51200EVM

Mfr. #: TPS51200EVM
제조사: Texas Instruments
설명: EVALUATION MODULE FOR TPS51200
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS51200EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS51200EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: LDO Voltage Regulators Bulk is the packaging method for this product The Special Purpose DC/DC, DDR Memory Supply is the Main-Purpose. 2.4 V ~ 3.5 V voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: 1.2 V ~ 1.5 V Buck regulator topology - Included item: Board. IC package type: TPS51200 Board type: Fully Populated. The product has 2, Non-Isolated outputs. Output voltage: 1.2 V to 2.5 V This product is an TPS51200 - Special Purpose DC/DC,DDR Memory Supply 2,Non-Isolated Outputs Evaluation Board. This tool is designed for the TPS51200. Input Voltage Range: 3.3 V

TPS51200EVM Image

TPS51200EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS51200EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type LDO Voltage Regulators
  • Packaging Bulk
  • Main-Purpose Special Purpose DC/DC, DDR Memory Supply
  • Voltage-Input 2.4 V ~ 3.5 V
  • Frequency-Switching -
  • Current-Output 2A, 10mA
  • Voltage-Output 1.2 V ~ 1.5 V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS51200
  • Board-Type Fully Populated
  • Outputs-and-Type 2, Non-Isolated
  • Output-Voltage 1.2 V to 2.5 V
  • Description-Function TPS51200 - Special Purpose DC/DC,DDR Memory Supply 2,Non-Isolated Outputs Evaluation Board
  • Tool-Is-For-Evaluation-Of TPS51200
  • Input-Voltage 3.3 V

TPS51200EVM

TPS51200EVM Specifications

TPS51200EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Special Purpose DC/DC, DDR Memory Supply

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 2.4 V ~ 3.5 V.

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is -.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 1.2 V ~ 1.5 V.

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck.

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS51200.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 2, Non-Isolated.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 1.2 V to 2.5 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is TPS51200 - Special Purpose DC/DC,DDR Memory Supply 2,Non-Isolated Outputs Evaluation Board.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS51200

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 3.3 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top