TPS79301EVM

Mfr. #: TPS79301EVM
제조사: Texas Instruments
설명: EVAL MOD FOR TPS79301
수명 주기: 이 제조업체의 새 제품입니다.
데이터 시트: TPS79301EVM 데이터 시트
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS79301EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: LDO Voltage Regulators Operational temperature range: -40°C ~ 125°C 2.7 V ~ 5.5 V voltage input Output voltage: 1.5V Included item: Board. IC package type: TPS79301 Board type: Fully Populated. The product has 1 - Single channel per IC. This product features a Positive Adjustable. Output voltage: 1.5 V to 2.8 V This tool is designed for the TPS79301. Our product measures 17.9 mm x 14.5 mm in dimensions for compact and convenient use. Input Voltage Range: 2.7 V to 5.5 V

TPS79301EVM Image

TPS79301EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS79301EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Linear Voltage Regulators
  • Series -
  • Product Evaluation Boards
  • Type LDO Voltage Regulators
  • Operating-Temperature -40°C ~ 125°C
  • Voltage-Input 2.7 V ~ 5.5 V
  • Current-Output 200mA
  • Voltage-Output 1.5V
  • Supplied-Contents Board
  • Utilized-IC-Part TPS79301
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Regulator-Type Positive Adjustable
  • Output-Voltage 1.5 V to 2.8 V
  • Tool-Is-For-Evaluation-Of TPS79301
  • Dimensions 17.9 mm x 14.5 mm
  • Input-Voltage 2.7 V to 5.5 V

TPS79301EVM

TPS79301EVM Specifications

TPS79301EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 125°C

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 2.7 V ~ 5.5 V.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 1.5V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS79301.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

  • A: What is the Regulator-Type of the product?

    Q: The Regulator-Type of the product is Positive Adjustable.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 1.5 V to 2.8 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS79301.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 17.9 mm x 14.5 mm.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2.7 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
수량
단가
내선 가격
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top